SAL was contracted by SDV for five shipments performed on a consecutive basis from load-ports Sattahip, Masan, Busan and Shanghai. All shipments were discharged at the LNG Project’s module offloading facility.
SAL’s MV Regine with two 700 tonnes cranes and open hatch capability together with a third aft mount crane of 350 tonnes lift cap was selected to work for the project.

